Self-Climbing Form System


Self-Climbing Form System

There's no need to crane in this system and it can be used to build shear walls of tall buildings or other high-raise structures with any dimension and complexity. Its registered trademark is "Self-Climber" and the installation of the shear wall forms are all done mechanically in this system.
This system climbs the distance of one floor in each stage by using hydraulic jacks, which are controlled through a central control panel. All of the forms reach the next stage of concrete pouring in a period of often less than 30 minutes and then, almost immediately, getting prepared for the next stage of concrete pouring will begin.
Using "Self-Climbing" system is considered economic only in structures with 15-20 storeys or higher.